Work Progress on Lot #14 Casita

Gerardo and crew are busy at work constructing a casita/house for Inversiones Torrente De Agua on Lot #14. The house has 2 floors with 3 bedrooms, 3 full bathrooms and a huge bodega/storage area below. By the end of next week, we should have the entire metal framework completed and hope to begin applying roofing materials soon.



1 comment:

Dick and Jim Saukville said...

Note that with Rob and Kent's help we were able to source three very low water consuming toilets. Only toilets will route to septic with rest of plumbing switchable to grey water system. Jim/Dick will be doing the rough plumbing using USA best practises. If you like, we might have a new career in CR!